Report: Workload Report (Issue Type)

Description:
Workload Report
Calculated Time Spent based on a specified Group Level.
and split by Issue Type.
Description:
Workload Report
Calculated Time Spent based on a specified Group Level.
and split by Issue Type.
Report Type:
Report Type (Predefined Group Level)
Display Model:
Define which Template is used to display Report (Hierarchical, Flat, ...)
Flattened Level:
Define the nb. of level to flat. By Default all levels are flattened, but it causes missing values if sub-task are presents.
See documentation for details (Worklog Reports)
Start Date Time: Pick a date
Low limit date time of entries. If not specified, begin of month of specified End Date.
Relative Date may be used (BOM, EOM, BOM-1M, -1D, ...) See Relative Date Operator
End Date Time: Pick a date
High limit date time of entries. If not specified, end of current month.
Relative Date may be used (BOM, EOM, BOM-1M, -1D, ...) See Relative Date Operator
Category:
Category on which report is generated (Optionnel)
Project:
Project on which report is generated (Optionnel)
Developer:

Developer having entered the time spent
Report Unit:
Report Unit used to display Time Spent
Show Issue Key:
If selected, the Issue Key is shown (i.e. FOO-1).
Show Issue Summary:
If selected, the Issue Summary is shown. (Defaulty assumed if Issue Key not shown)
Issue Type format :
How is displayed the Issue Type