Report: Workload Report (Worklog Type)

Description:
Workload Report
Effective Estimate is Max(Original Estimate,(Remaining Estimate + Spent Time))
Graphical mode displays relative value (% against effective estimate) :
- Original Estimate
- Estimate (remaining)
- Typed Worklog
Description:
Workload Report
Effective Estimate is Max(Original Estimate,(Remaining Estimate + Spent Time))
Graphical mode displays relative value (% against effective estimate) :
- Original Estimate
- Estimate (remaining)
- Typed Worklog
Report Type:
Report Type (Predefined Group Level)
Display Model:
Define which Template is used to display Report (Hierarchical, Flat, ...)
Start Date Time: Pick a date
Low limit date time of entries. If not specified, begin of month of specified End Date.
Relative Date may be used (BOM, EOM, BOM-1M, -1D, ...) See Relative Date Operator
End Date Time: Pick a date
High limit date time of entries. If not specified, end of current month.
Relative Date may be used (BOM, EOM, BOM-1M, -1D, ...) See Relative Date Operator
Category:
Category on which report is generated (Optionnel)
Project:
Project on which report is generated (Optionnel)
Developer:

Developer having entered the time spent
Report Unit:
Report Unit used to display Time Spent
Show Issue Key:
If selected, the Issue Key is shown (i.e. FOO-1).
Show Issue Summary:
If selected, the Issue Summary is shown. (Defaulty assumed if Issue Key not shown)
Show Worklog Type:
Defines how the Worklog Type displayed